We Deliver Full-Line Concrete Equipment Solutions

Home / All / FAQ / Concrete Pump Concrete Cylinder Disassembled Steps

Concrete Pump Concrete Cylinder Disassembled Steps

Update Time:2026/6/24
Concrete Pump Concrete Cylinder Disassembled Steps
1. First, remove both pistons from the water tank (Figure 1).
2. Flatten the swing valve pressure ball valve and release the pressure. Wait until the pressure gauge on the swing valve (Figure 3) shows no pressure before proceeding to the next step (Figures 2 and 3).
3. Disconnect the hoses connecting to the two swing cylinders, the agitator motor hose, and the connected lubricating oil hose (Figures 4 and 5).
4. Remove all six tie rod bolts on the side of the water tank (Figure 6).
5. Remove the six bolts securing the hopper on both sides (Figure 7).
6.After removing all connections, use a forklift to lift the bottom of the hopper and pull it outwards (Figure 8). (Be careful not to touch the discharge switch.)
FAQs

Are you looking for a reliable manufacturer of concrete machinery and construction equipment?

We provide fast market-oriented solutions, technical support, and customized services to help your business grow.
Contact Person
Michael Liu
Name:
Michael Liu
Tel:

+86 186-69798625

+86 532-89659612

Email:
saintyoldawin@163.cominfo@saintyoldawin.commichael@saintyoldawin.com
WhatsApp:
8618669798625
Address:
Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
follow us
Please send your message to us
*Email
Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.