We Deliver Full-Line Concrete Equipment Solutions

Home / All / Industry News / Basic Techniques for Concrete Placing Boom Machine Operation

Basic Techniques for Concrete Placing Boom Machine Operation

Jan 22,2026
Pre-installation Inspection

First, before installing the concrete placing boom, carefully inspect each component and pipe clamp of the assembled boom.
Second, when using a tower crane to lift the concrete placing boom, carefully inspect the lifting equipment used and select the appropriate placement location.
Then, when the concrete placing boom is positioned on the top of the formwork, select the correct placement location and reinforce the four legs of the boom. Note that reinforcement should be done under the top of the formwork, and the reinforcement dimensions should be determined based on the size of the concrete placing boom.

Are you looking for a reliable manufacturer of down home textile products?

We can quickly provide customers with market analysis, technical support and customized services.
Contact Person
Michael Liu
Name:
Michael Liu
Tel:

+0086-186-69798625

+0086-532-89659612

Email:
WhatsApp:
8618669798625
Address:
Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
follow us
Please send your message to us
*Email
Mobile Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.