- How to adjust the displacement of the concrete pump truckDuring operation, the pumping displacement of the concrete pump truck depends on constantly adjusting the pumping speed to change the size. The adjustment of the pumping displacement is also very important. Do you know if it changes? Today I will teach you how to change the pumping displacement. Common ways to measure:Apr 7,2023
- How to pump when the head of the pump truck is not high?When the concrete pump is carrying out short-distance pumping construction with low head and short distance, it only needs to erect the first boom hinged with the boom turret, and then unfold the fourth and fifth booms at the end. The jib combination for short-distance pumping is composed of the first, fourth, and fifth-section booms to meet the needs of short-distance pumping construction. At this time, the second and third section booms lean against the head boom.Mar 27,2023
- How to solve the pumping distance of the pump truckThe section end boom is crimped and at the end of the extended section boom the concrete is pumped out of the attached discharge hose using the pipe switch. This solution can effectively reduce the height and length of the boom during pumping, so as to achieve the purpose of saving. However, the pipe switching device and unloading hose added to the curled part of the end boom have a great influenceMar 27,2023
- Pay attention to the pressure when the pump truck is in usePurpose: To guide the pressure adjustment of the pumping, reversing, stirring, and washing hydraulic systems of the sky pump. Adjustment steps: Loosen all the adjustment screws of the main relief valve on the main valve block and all the relief valves on the auxiliary valve block.Mar 27,2023
- What is the approximate cost of concrete pump maintenance1. Pump pipe: a set of good quality wear-resistant pipe, the service life is generally about 30,000 cubic meters of concrete, that is to say, it must be replaced after 30,000 cubic meters of concrete is hit. Therefore, according to the annual pumping of 100,000 cubic meters of concrete machinery, at least 3 sets of pump pipes must be replaced a year.Mar 20,2023
- Relevant safe operation of pump truck outriggersThe outriggers of the sky pump play a very important role in the whole car. If the chassis is not stable enough, it will fall easily. Therefore, the stability of a car has a crucial relationship with the outriggers. Whether the outriggers can be stably attached to the ground is also a very important link in the safety inspection of sky pumps.Mar 20,2023
- The working principle of the pump truck when pumping concreteWorking principle of concrete pump Concrete pump (support pump) is composed of hopper, pump body, hydraulic cylinder for driving slide valve, slide valve, conveying cylinder, main hydraulic cylinder and pilot valve. When the main hydraulic pump drives the concrete piston to retract, under the push of the mixing blade, the concrete poured into the hopper is sucked into the delivery cylinder through the suction port of the slide valve. When the main hydraulic cylinder moves forward,Mar 20,2023
- Pay attention to the use of related parts of pump trucksAnyone who has used a pump truck knows that the pump truck is particularly expensive for lithium-based grease, commonly known as butter, because of the special structure of the hopper. In order to ensure that the shaft is not intruded and worn by concrete, the butter is continuously overflowed from the sealed cavity, and the concrete Push it outwards to protect the inner shaft and bearings by consuming grease.Mar 16,2023
- The importance of hydraulic cylinders to truck mounted concrete pumpThe number of hydraulic cylinders used in the concrete industry is very high, and different numbers of cylinders are used according to the number of different arms. A balance valve is used on each cylinder, which shows the importance of the balance valve, so today we will analyze it and possible problems.Mar 16,2023
- How to solve the problem of accidentally touching the wire when the pump truck is exhibiting the boomIf the pump truck touches the wires, the measures that should be taken are:Mar 1,2023
- Pump truck be careful when extending the boom. Before moving the boom and extending the outriggers, check whether there are obstacles around. Prevent the jib or outriggers from touching buildings or other obstacles. When the operator cannot observe the entire work area or cannot accurately determine the distance between the outstretched part of the pump truck and adjacent objects, a guide should be assigned to command.Mar 1,2023
- What are the common pump truck piston problemsSince the piston of the concrete pump truck is a very important part, it needs to be in direct contact with the concrete, so the requirements for it are also very high, and there are very strict requirements for sealing and wear resistance, so sometimes if Something happened, and we should also think about whether it is a problem with the piston.Mar 1,2023
Are you looking for a reliable manufacturer of down home textile products?
We can quickly provide customers with market analysis, technical support and customized services.Contact Person

- Name:
- Michael Liu
- Tel:
+0086-186-69798625
+0086-532-89659612
- WhatsApp:
- 8618669798625
- Address:
- Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
Please send your message to us
- Mobile Phone
- *Title
- *Content