We Deliver Full-Line Concrete Equipment Solutions
Language:
Industry News
- Are you still using traditional placing rod ? You are out of dateWith the continuous emergence of high-rise buildings, problems such as high wind load and high pumping have brought great difficulties to the construction of high-rise structures. Among them, the construction of concrete placing boom is a big problem.Nov 30,2021
- The main points of fine stone concrete pump pumpingThe fine-stone concrete pump is a special type of concrete pump. This concrete pump is widely used in floor heating projects and floor construction, so it is welcomed by the majority of construction parties. So on the construction site, what are the pumping requirements of the fine stone concrete pump? Now let’s take a closer look.Nov 24,2021
- Do these four things, keep away from blocking concrete pump placing boom pipelinesIn the concrete pumping construction operation, once the pipe blockage occurs, the slight blockage can be dredged by repeated forward and reverse pumps and tapping with a wooden hammer. Serious blockage may need to be removed and replaced. Therefore, prevention of pipe blockage is particularly important.Nov 23,2021
- Why is your concrete placing boom blockedConcrete pumping equipmentNov 16,2021
Causes of blocked pipes
With the rapid development of building construction, concrete pumping equipment concrete placing boom has been widely used by construction units. However, in the concrete pouring operation, due to improper use, the phenomenon of equipment pipe blockage occurs from time to time, which not only affects the project progress, but also directly affects the project quality. - what a good useful concrete placing boom machine, hurry up to purchase.The hydraulic concrete placing boom is a kind of terminal equipment used in conjunction with the concrete pump. It is suitable for the construction of high-rise buildings and large-area concrete pouring projects. It can easily and efficiently transport the concrete to the pouring operation point, realize continuous and uniform distribution, and reduce construction costs. Improve the quality of concrete pouring and construction progress.Nov 11,2021
- What is the cause of the failure of the boom at backhoe loaderIt is inevitable that there will be some failures when using backhoe loader to be busy for construction. Today we are explaining what is the reason for the failure of the boom.Nov 10,2021
- Talk about the working principle of the backhoe loader at workThe extensive use of backhoe loader not only saves man power and material resources, but also greatly improves work efficiency. Let’s take a look at the working principle of backhoe loader:Nov 10,2021
- How to safely install and disassemble the concrete placing boom1 The main personnel involved in the concrete placing booms installation and disassembly must be familiar with the performance structure and characteristics of the cloth machine, skilled in technology, and have the ability to troubleshoot.Nov 4,2021
2 In the process of concrete distributor assembly and disassembly, a special person must be responsible for unified command.
3 The placing boom assembly and disassembly site should be cleaned up, and non-workers are prohibited from entering. - Concrete wet shotcrete truck is a large wet shotcrete machineWith the development of science and technology, the continuous expansion of the construction field, the continuous improvement of engineering construction quality requirements and the need for environmentally friendly construction, various types of wet spraying machines have emerged, including small concrete wet spraying machines, vehicle-mounted concrete wet spraying machines, and It is suitable for wet spraying concrete equipment such as concrete wet spraying trolley for large-scale projects.Nov 1,2021
- Reasons for pipe blockage of wet spraying truck and emergency measuresIn recent years, the emergence of wet spraying trolleys has solved many inconveniences in the construction process of today's projects, and has improved the efficiency of tunnel construction, coal mine construction, and slope sprayed concrete construction. The progress of China's construction machinery and equipment is largely attributed to the reform and opening up. During this period, front-end technology and foreign-funded enterprises were successively introduced.Nov 1,2021
- Is your Concrete placing boom working safely?Daily inspection of concrete placing booms.Oct 27,2021
Check whether the electrical system is working properly before operation.
Check whether the oil level of the oil tank is lower than half of the oil tank and whether the hydraulic oil is emulsified. Check whether there is leakage of hydraulic components.
Check whether the rotation direction of the oil pump is correct.
Check whether the metal structural parts are cracked, welded, twisted or deformed. - How to be lifted / jacked-up to the tower hydraulic self-climbing concrete placing booms ?How to be lifted / jacked-up to the tower hydraulic self-climbing concrete placing booms ?Oct 21,2021
Are you looking for a reliable manufacturer of down home textile products?
We can quickly provide customers with market analysis, technical support and customized services.Contact Person

- Name:
- Michael Liu
- Tel:
+0086-186-69798625
+0086-532-89659612
- WhatsApp:
- 8618669798625
- Address:
- Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
Please send your message to us
- Mobile Phone
- *Title
- *Content











