  • Maintenance knowledge of hydraulic concrete placing boom
    Maintenance knowledge of hydraulic concrete placing boom
    Time flies, the annual vacation is about to start, and the maintenance of the hydraulic concrete placing boom machine must be done well before the holiday.
    1. Maintenance of mechanical system.
    1. Check whether the connecting bolts, shaft end clamps, pins, and nuts for locking the hydraulic placing boom are loose.
    2. Check whether the cotter pin of the cloth machine falls off.
    Jan 14,2022
  • Under special construction conditions, choose these two distributing machines concrete placing boom
    Under special construction conditions, choose these two distributing machines concrete placing boom
    Hydraulic placing boom machine is a kind of terminal equipment used with concrete pump, which is suitable for the construction of high-rise buildings and large-area concrete pouring projects, which improves the quality and construction progress of concrete pouring. However, what type of hydraulic placing boom machine should be used under special construction conditions?
    Jan 12,2022
  • Concrete wet spraying machine needs regular maintenance
    Concrete wet spraying machine needs regular maintenance
    After working for a period of time, everyone will choose a place for vacation. Concrete wet spraying machine is a commonly used concrete wet spraying equipment. After many times of construction, it also needs to be maintained. The cured concrete wet spraying machine can not only help improve construction efficiency and shorten the construction period, but also greatly reduce the labor cost of construction.
    Dec 22,2021
  • What are the main aspects to buy hydraulic concrete wet spraying machine
    What are the main aspects to buy hydraulic concrete wet spraying machine
    The wet spraying machine adopts hydraulic transmission, pumping the concrete to a certain distance or to the nozzle, and then sprays the concrete onto the supporting surface with compressed air. At the same time, add an appropriate amount of accelerator to mix with the concrete at the nozzle to accelerate curing The dosage of the agent is adjusted by the metering pump.
    Dec 22,2021
  • The correct use method of concrete pump during operation
    The correct use method of concrete pump during operation
    1. Straight-line laying of pipelines: In the process of laying concrete pump pipelines, it is generally necessary to ensure that the pipeline laying lines and pouring points of the pumping equipment are straight, and the curvature is minimized as much as possible. At the same time, the laying of the concrete pump pipe support and the fixing of the pipe must be tight and reliable, and the pipe joints should be sealed and reliable, and the hose and steel pipe should not be mixed together.
    Dec 22,2021
  • Notes for concrete placing boom operators
    Notes for concrete placing boom operators
    1. Concrete placing booms Operators need to go through relevant technical learning and training, carefully read the operating instructions, be familiar with the working principle of the cloth machine, master the working essentials, and be in good health. They can only work after passing the inspection.
    Dec 15,2021
  • Precautions for safe operation of concrete placing boom
    Precautions for safe operation of concrete placing boom
    1. When the wind speed exceeds level 6, the concrete placing boom is strictly prohibited from working. When the wind speed exceeds level 4, disassembly and assembly of the concrete distributor is strictly prohibited.
    2. The placing boom should keep a certain distance from the high-voltage wire relay.
    Dec 8,2021
  • No enough budget? Recommend two cost-effective concrete placing booms!
    No enough budget? Recommend two cost-effective concrete placing booms!
    Mobile & walking
    The mobile hydraulic distributing machine is composed of distributing placing boom assembly, swivel support, tower body, underframe, concrete pipeline, hydraulic system, electrical system and other components.
    Dec 3,2021
  • Are you still using traditional placing rod ? You are out of date
    Are you still using traditional placing rod ? You are out of date
    With the continuous emergence of high-rise buildings, problems such as high wind load and high pumping have brought great difficulties to the construction of high-rise structures. Among them, the construction of concrete placing boom is a big problem.
    Nov 30,2021
  • The main points of fine stone concrete pump pumping
    The main points of fine stone concrete pump pumping
    The fine-stone concrete pump is a special type of concrete pump. This concrete pump is widely used in floor heating projects and floor construction, so it is welcomed by the majority of construction parties. So on the construction site, what are the pumping requirements of the fine stone concrete pump? Now let’s take a closer look.
    Nov 24,2021
  • Do these four things, keep away from blocking concrete pump placing boom pipelines
    Do these four things, keep away from blocking concrete pump placing boom pipelines
    In the concrete pumping construction operation, once the pipe blockage occurs, the slight blockage can be dredged by repeated forward and reverse pumps and tapping with a wooden hammer. Serious blockage may need to be removed and replaced. Therefore, prevention of pipe blockage is particularly important.
    Nov 23,2021
  • Why is your concrete placing boom blocked
    Why is your concrete placing boom blocked
    Concrete pumping equipment

    Causes of blocked pipes
    With the rapid development of building construction, concrete pumping equipment concrete placing boom has been widely used by construction units. However, in the concrete pouring operation, due to improper use, the phenomenon of equipment pipe blockage occurs from time to time, which not only affects the project progress, but also directly affects the project quality.
    Nov 16,2021

Are you looking for a reliable manufacturer of down home textile products?

We can quickly provide customers with market analysis, technical support and customized services.
Contact Person
Michael Liu
Name:
Michael Liu
Tel:

+0086-186-69798625

+0086-532-89659612

Email:
WhatsApp:
8618669798625
Address:
Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
follow us
Please send your message to us
*Email
Mobile Phone
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.