We Deliver Full-Line Concrete Equipment Solutions
Language:
Home / All
News
- Pay attention to the use of related parts of pump trucksAnyone who has used a pump truck knows that the pump truck is particularly expensive for lithium-based grease, commonly known as butter, because of the special structure of the hopper. In order to ensure that the shaft is not intruded and worn by concrete, the butter is continuously overflowed from the sealed cavity, and the concrete Push it outwards to protect the inner shaft and bearings by consuming grease.Mar 16,2023
- The importance of hydraulic cylinders to truck mounted concrete pumpThe number of hydraulic cylinders used in the concrete industry is very high, and different numbers of cylinders are used according to the number of different arms. A balance valve is used on each cylinder, which shows the importance of the balance valve, so today we will analyze it and possible problems.Mar 16,2023
- How to solve the problem of accidentally touching the wire when the pump truck is exhibiting the boomIf the pump truck touches the wires, the measures that should be taken are:Mar 1,2023
- Pump truck be careful when extending the boom. Before moving the boom and extending the outriggers, check whether there are obstacles around. Prevent the jib or outriggers from touching buildings or other obstacles. When the operator cannot observe the entire work area or cannot accurately determine the distance between the outstretched part of the pump truck and adjacent objects, a guide should be assigned to command.Mar 1,2023
- What are the common pump truck piston problemsSince the piston of the concrete pump truck is a very important part, it needs to be in direct contact with the concrete, so the requirements for it are also very high, and there are very strict requirements for sealing and wear resistance, so sometimes if Something happened, and we should also think about whether it is a problem with the piston.Mar 1,2023
- What specific steps should the pump truck carry out pouring according to the regulations?During the construction process, the pump truck must be poured according to the regulations. Today, I will introduce to you the pouring sequence of the pump truck.Feb 6,2023
- How to maintain the pump truck to prolong its service lifeAs a popular pumping equipment at present, concrete pump truck can greatly improve construction efficiency and is very popular with construction parties. However, in order to prolong the service life of the concrete pump, it is necessary to carry out the necessary maintenance, which can be carried out from the following aspects.Feb 6,2023
- The seal of the gate valve is limited by the structure, and attention should be paid to the construction of the concrete pump truckThe sealing of the gate valve is limited by the structure, and the sealing pressure is low. It is inevitable to use a Y-shaped pipe to connect the double cylinder of the concrete pump and the delivery pipe during construction, and the Y-shaped pipe will cause a large pressure loss. In addition, when the gate valve is used for conveying, it is also required to install a horizontal conveying pipe section in front of the vertical conveying pipeline,Feb 6,2023
- Tell you 8 ways to prevent concrete pipe plugging1. Control workability and slump of concreteDec 27,2022
The pumped concrete shall be designed in strict accordance with the regulations, the slump shall be strictly controlled, and the following principles shall be followed. (1) The ratio of the maximum particle size of coarse aggregate to the diameter of the conveying pipe should be: when the pumping height is below 50 m, it is not suitable for gravel - Why did the construction site choose to use a mobile hydraulic concrete placing boom?As the terminal equipment for pumping concrete, the mobile hydraulic concrete placing boom is used to send the pumped concrete through the pipeline to the formwork of the component to be poured. The hydraulic concrete placing boom does not need to be fixed when used, and the position and conveying direction can be flexibly changed according to the needs of the construction site.Dec 26,2022
- Internal Jack up tower concrete placing boom installationHGY24 concrete hydraulic concrete placing boom is a terminal equipment used in conjunction with concrete pumps. It is suitable for the construction of high-rise buildings and large-area concrete pouring projects. Reduce construction cost, improve concrete pouring quality and construction progress.Dec 14,2022
- Wet concrete spray truck manipulator operation process sharingFor the safety of construction personnel, the safety operation process of wet concrete spraying manipulator is specially made:Dec 8,2022
1. It is strictly forbidden to use the manipulator as a crane or lifting platform.
Are you looking for a reliable manufacturer of down home textile products?
We can quickly provide customers with market analysis, technical support and customized services.Contact Person

- Name:
- Michael Liu
- Tel:
+86 186-69798625
+86 532-89659612
- WhatsApp:
- 8618669798625
- Address:
- Office: 216# THE 308 STATE ROAD, CHENGYANG DISTRICT, QINGDAO SHANDONG,CHINA. Factory: No.413# Tieqishan Road, Yuhuangling Industrial Park, Chengyang District, Qingdao, China
Please send your message to us
- Phone
- *Title
- *Content












